Intercontinental - 02

Key facts & challenges

Summary
The new £121m hotel located next to the O2 Arena
Sector
Hotel
Project Value
£121m
Client
DESIGNER: Grove Developments
Contractor
Balfour Beatty
Subcontractor
Errigal Contracts
Location
London, UK
Country
UK
Installation Description
“We have never previously installed a drylining system on the scale of a 80x41m clear span ballroom ceiling. We were assisted with expert technical support from Siniat to deliver this.”
Installation
Located next to the O2 Arena, the new £121m hotel is being built as part of a development of a 7.6 acre site on Greenwich Peninsula.
Quote from
Alan Birdy, Senior Quantity Surveyor Errigal Contracts
Impact
“I warmly welcome the proposal to bring this prestigious development to London. The project demonstrates great confidence in the city and will be a significant addition to the legacy East London is seeing following the London 2012 Olympic and Paralympic Games. Integral to London’s success in attracting visitors is the range of excellent hotels London has to offer – the hotel would be a fantastic addition to the capital, and would bring substantial benefits for visitors to The O2 and the wider area, as well as securing additional benefits to the local economy and enhance the area’s reputation as a key visitor destination.”
Quote from
Boris Johnson

Project description

Located next to the O2 Arena, the new £121m hotel is being built as part of a development of a 7.6 acre site on Greenwich Peninsula which will also see the construction of a separate 23-storey tower (Peninsula Tower) featuring 100 serviced apartments. A design & build scheme by Balfour Beatty, the 5-star hotel will be operated by InterContinental Hotel Group. The hotel is 19-storeys in height and features the largest special event space in Europe – the ballroom. This massive 4,800 sq m of space overlooks Canary Wharf and will hold 2,400 diners in a column-free chamber measuring 7.7m high, 77m in length and 41m wide. The hotel also offers leisure facilities including a health spa, several restaurants and a panoramic Sky Bar. Balfour Beatty appointed Siniat as its key drylining supply partner.

Innovative, Smart & Efficient Solutions

Tested & Certified Solutions

Global Service Network