Logistical Support

We offer a range of load size options and vehicles to suit all types of delivery locations, from remote rural merchant branches to the busiest urban construction sites.

Vehicle types

Our vehicles are fully enclosed curtainsider articulated lorries, with a maximum load capacity ranging from 12.5 tonnes to 28 tonnes.

Vehicle type Min load capacity (tonnes) Max load capacity (tonnes)
Artic with Moffett 23 25.5
Rigid 14 16
Rigid with Moffett 11 12.5
Urban Artic 16 18.5
Urban Artic with Moffett 15 17.1
Flatbed 23 28

*Prices available on application.

Delivery Times

We are pleased to offer a range of load size options with free next day delivery on full loads ordered before 2pm*.

Load size Tonnes Delivery times
Full 26+ Within 3 working days
Part load 14 - 25.9 Within 6 working days
Half load 12 - 14 Within 6 working days
Small load 6 - 12 Within 6 working days

*If ordered by 2pm and subject to availability.

 

The importance of a Pre-Project Delivery Assessment

The Study Inn site in the heart of historic Cambridge has delivery restrictions that would make the most experienced of site managers wince: four hours restricted access, 7.5 tonne weight restriction, single sided offload only.

Deliveries went smoothly from the start because of the thorough preparation done by SIG Sheffield and our logistics provider, Wincanton. As a result of their Pre-Project Delivery Assessment (PPDA), a bespoke plan was put into place, which included:

• Specialist single-sided 16 tonne moffett hired for the project
• Boards split into one tonne pallets to accommodate a single hoist on site
• 30 minutes notice given by the driver on vehicle arrival

The project – an 345-bedroom student accommodation block – is progressing without any delivery problems. If you’d like to know more about a Pre-Project Delivery Assessment, please contact us at orderline@siniat.co.uk